Used to quantify the amount of variation of a set of data values from its mean.

Where,\ σ = Standard Deviation\ Xi = Data observations\ µ = Mean of Xi observations\ N = Number of observations if number of observations is > 30, Else It is N-1
Difference between the Actual demand observed and the forecast.\ Actual Demand - Forecast
Measure of how close the Actual Demand is to the forecasted quantity.
Forecast Accuracy = 1 – Forecast Error. Forecast Error needs to be expressed as a relative measure for this.
If Forecast Error > 1, then Forecast Accuracy = 0.

Also called a Pareto analysis or the 80/20 rule, it categorizes Items into different types depending on value and use.
Change in demand from period to period and is the measurement of how much variability can occur in the demand from customers.
Total demand between now and the anticipated time for the delivery after the next one if a reorder is made now to replenish the inventory.
Most popular distribution model for determining probability and works well in predicting demand variability based upon historical data. Here demand volume is assumed to be normally distributed.
A sensitivity analysis is a technique used to determine how different values of an independent variable impact a particular dependent variable under a given set of assumptions. In the application, you can define the Lead time step, forecast error step and Number of steps. The process of recalculating outcomes under alternative assumptions to determine the impact of variable under sensitivity analysis can be useful for range of purposes.

Time needed for the material to complete the quality inspection to move to the storage (obtained from ERP).
Standard unit or system of units by means of which a quantity is accounted for.

Amount of time required for an item to be available for use from the time it is ordered. This is normally mean of Lead Times captured over last few months.
Range of all the captured lead times for a combination. For example, if there are lead times captured in last 6 months, then Lead Time Range will be Max (Lead Time) – Min (Lead Time).
It is the probability that says lead time is within the range given.
Expectation of the squared deviation of a Lead Time observation from its mean.

This is calculated in Arkieva Inventory Planner
Inventory costing method used in manufacturing environments that uses the materials costs in the bill of materials combined with the labor costs and machine costs in the routing to calculate the cost of the finished or semi-finished item (from ERP).
The costs associated with the ordering of new batch of raw materials or Procured Finished goods.
The amount of money a company spends to keep inventory safe and stored over a certain length of time (obtained from ERP).
The cost of total expenses that do not change for a certain period without directly relating to the production or sales amount of the product (obtained from ERP).
Refers to Holding Cost.
This is the combination of both internal and external Demand. Internal Demand will include Internal Consumptions, STOs, Internal Movements. External Demand will involve Shipments to other companies or customers.

Last 12 months usage forecast captured at the Item – Location level on monthly basis.
Last 12 months Usage captured at the Item – Location level on monthly basis.
Inventory Captured during the last reporting time.
Also, known as order quantity, represents the quantity of an item you order for delivery on a specific time.
Expected probability of not hitting a stock-out during the next replenishment cycle, and thus, it is also the probability of not losing sales. The cycle duration is implicitly the lead time. The service level can also be defined as the probability of being able to service the customers’ demand ever facing any backorder or lost sale.
While a 100% service level might - i.e. service all customers all the time - appear desirable, it is usually not a feasible option.
It is the daily average of the forecast.

This method takes the minimum of variances calculated by all the other methods.

This is square of the standard deviation of those historical observations where Actual usage are more than the Usage Forecast.

Where,\ σ = Standard Deviation\ (U-F)i = Observation where Actual Usage > Usage Forecast\ μ(U-F) = Mean of (U-F)i observations\ N = Number of observations if number of observations is > 30, Else It is N-1
Modified Forecast Variance = σ^2

If shipment \< forecast, then replace the number with 0; this means variance is calculated over the same as original number of values, with some values artificially changed to 0. You can see how this is different by trying the SQL queries provided here.

This is square of the standard deviation of Historical Usage.

Where,\ σ = Standard Deviation\ Ui = Historical usage observations\ µ = Mean of Ui observations\ N = Number of observations if number of observations is > 30, Else It is N-1
Standard Demand Variance = σ^2

This is square of the standard deviation of Historical Forecast Usage.

Where,\ σ = Standard Deviation\ Fi = Historical Forecast usage observations\ µ = Mean of Fi observations\ N = Number of observations if number of observations is > 30, Else It is N-1
Standard Forecast Variance = σ^2



Where,\ z is the Normal function coefficient for a given Desired Service Level.\ μL is the expected value of lead time, which is assumed to be the mean lead time.\ σd^2 is the Variance of Demand error about the mean\ μd is the expected value of demand, which is assumed to be the mean demand.\ σL^2 is the Variance around its mean
The first term covers the demand during mean lead time. The second term covers for the lead time variability.

Safety Stock is fixed as the last 3 periods average usage for the Item Location combination.
Safety Stock is fixed as the future 3 periods average Forecast for the Item Location combination.
Safety Stock is fixed as 0.
While calculating Safety Stock, service level (Z) is considered based on the Fill Rate of the order and not actual quantity in the order. So, it is percentage of demand that is met on time.\ Ex: 1000 T ordered/year, SL = 98%, 980 T must be delivered on time, 20 T may be late (could be merely 1 ton short for 20 orders out of a total of 100 orders; P1 SL achieved would then only be 80%, while the P2 SL would be 98%).\ Fill Rate = (Yearly Demand - Units Short per Year) / (Yearly Demand).
Discrete probability distribution that expresses the probability of a given number of events occurring in a fixed interval of time. The Poisson distribution is typically used to define a reorder-point rather than a safety stock.
While calculating Safety Stock, service level (Z) is considered based on the actual quantity in the order.
Protection against natural variations in demand and/or supply.
Safety Stock Units * Standard Cost.

Demand during production cycle.

Cycle Stock Units * Standard Cost.

The amount of inventory required to meet all demand.\ Target Stock = Safety Stock Units+ Cycle Stock.
Target Stock Units * Standard Cost.

Safety Stock + Demand During Lead Time.
WHERE Demand During Lead Time = Average Daily Usage * Lead time (days).
Amount of Inventory volume available at that moment.
Current Stock Value = Current Stock Units * Standard Cost.

The quantity that can be used for planning without reservations depending on the industry or business.
Inventory Items rendered unusable or diminished in value.
Orders that facilitate movement of inventory from one location to Another.
Total number of stock-keeping units (SKUs) that are currently being shipped from one location to another (obtained from ERP).
The order which is necessary to produce items in advance before receiving an order from a customer after determining the customer's specifications based on the demand forecast.
Inventory that is blocked from further usage.
Inventory quantity that is being blocked for Quality inspection.
Cost of goods sold (COGS) refers to the direct costs of producing the goods sold by a company. This amount includes the cost of the materials and labor directly used to create the good. It excludes indirect expenses, such as distribution costs and sales force costs.
COGS = Beginning Inventory + Purchases During the Period – Ending Inventory

The number of times inventory is consumed or sold during a one-year period. There are different ways this can be calculated.



Written instructions from the top management on the level and location of inventory to be held by a firm. E.g. MTS, MTO.
Refers to a specific item in a specific unit of measure.
The number of units that a company should add to inventory with each order to minimize the total costs of inventory - such as holding costs, order costs, and shortage costs.

Amount of days where shipments are covered by unrestricted inventory quantity.

Total period of time that elapses from the moment it is determined that the product should be reordered until the product is back on the shelf available for use. It is obtained from ERP.







Matches results in the IP document Input Data







Match results in the IP document Input Data:







Matches results in the IP document Input Data:







Match results in the IP document Input Data:

Ignore Leading 0 combinations Defined in table : InventoryOptimizationInputDataConfig_XXXX






Matches results in the IP document Input Data:

Ignore Leading 0 combinations Defined in table : InventoryOptimizationInputDataConfig_XXXX






Match results in the IP document Input Data:







Matches results in the IP document Input Data:







Match results in the IP document Input Data:

👍 The Inventory Planner Safety Stock Updated Variance Calculations spreadsheet can be found in your client documentation server and within the Arkieva application.
Steps for Safety Stock Validation:\ Select a Material-Plant combination in Arkieva to use for validation. Update all cells highlighted in yellow as they are user inputs needed for SS calculation. The data will be calculated based on the user input provided.
Next, to calculate the safety stock for the material plant combination you must provide input data consistent with the input data in the Arkieva IP document.
Once all input data is updated, the calculations for all three types of variance (demand, forecast and modified forecast) and the three Safety Stock calculation methods (P1, P2 and P4) will get updated.
Lastly, compare Safety Stock, Target Stock and Reorder point values with the results in IP document in Arkieva.
📘 Note
- Leading 0's in the Demand (Usage) quantity is ignored from the Safety Stock Calculations. Adjust Demand Mean and Variance formula to ignore Leading 0's.
- Safety Stock Calculation in Arkieva is a two step process: (a) Base Safety Stock (BSS) is calculated as KSQRT (Average Lead Time Demand Variance + SQR (Average Demand) * Standard Deviation Lead Time) Where K depends on the service level. Then, (b) it converts it into normalized safety stock (NSS) to account for the future increase or decrease in demand (via forecast). This allows the SS to be higher in periods where forecast is high and vice versa. This is why our safety stock module allows for safety stock by periods.
- Normalized Safety Stock in Arkieva is calculated as BSS * (Average Daily Demand/Demand Mean).
Monthly

